I figured I'd do it now before it gets warm enough to ride and spare myself missing a week or two of riding. I read some DIY's and found out I would need shims, a micrometer, and feeler gauges. I also printed out the service manual I downloaded here.
I printed the service manual front and back and it's still over 1.5 inches thick. I think I will three hole punch it and place it in a binder later.


No comments:
Post a Comment